13/12/2001: A section from the donor car is welded in and the new kidney bowl attached. Now
we can see that the left hand sill has now been completely repaired with a new outer sill and jacking point
New kidney bowl (right and above)
Dave has made up a small panel to fill in the gaps left after all the new sill panels are attached. This is
welded in and ground down (far right)